Pipeline Armoring

An exposed 20" pipeline in Louisiana presented unique challenges. The pipeline exposure was located on a hillside in rural Louisiana. The exposure was caused by eroded gullies caused by concentrated sheet flow and ATV traffic.

All materials required for the repair needed transported over a mile on a haul road. The concrete erosion mat, Flexamat Plus, was chosen for the repair. The tied concrete block mat is packaged in rolls of custom sizes. Morooka Buggies hauled the rolls to the project site.

8' x 50' rolls of Flexamat Plus were used to armor the terraces and channels.

Contact us for more project details.

Video:


Return to the top of the view

Location: Southeast
Installation Date: August 2019
Owner: Utility
Type of Flexamat Product: Flexamat Plus
Quantity of Flexamat: 18,000 SF
Gallery:
20190718_162530476_iOS.jpg 20190718_162545054_iOS.jpg 20190718_162551959_iOS.jpg 20190718_162637292_iOS.jpg 20190718_162646332_iOS.jpg 20190718_162843693_iOS.jpg IMG_0369.jpg IMG_0384.jpg IMG_0397.jpg IMG_0412.jpg IMG_0436.jpg IMG_0550.png IMG_0556.jpg IMG_0610.jpg IMG_0613.jpg IMG_0667.jpg